Automatic insertion of wait labels

Before the insertion of wait labels the operations must be reordered in the sequencing mode if the project contains more than one part. See the section of multi part project for details.

Any operation can have the parameter "wait other channel" on the Links/Leads page. This parameter is visible only if the previous operation in the reordered sequence works in other channel.

If wait other channel is enabled then SprutCAM inserts the <Wait> command. So the current operation will not start until the previous operation is finished.

images/download/attachments/92868349/SyncPoints1_eng.png


Another way for the automatic insert of the wait labels is using the Turn take over operation. It can be synchronized with the part-off operation.

images/download/attachments/92868349/SyncPoints2_eng.png